Coverart for item
The Resource Estimating soft costs for major public transportation fixed guideway projects, AECOM ... [et al.], (electronic resource)

Estimating soft costs for major public transportation fixed guideway projects, AECOM ... [et al.], (electronic resource)

Label
Estimating soft costs for major public transportation fixed guideway projects
Title
Estimating soft costs for major public transportation fixed guideway projects
Statement of responsibility
AECOM ... [et al.]
Contributor
Subject
Language
eng
Summary
TRB's Transit Cooperative Research Program (TCRP) Report 138: Estimating Soft Costs for Major Public Transportation Fixed Guideway Projects defines and describes soft costs and provides a new suggested methodology to estimate soft costs based on historical projects. The report also examines detailed technical information about the data collection, methodology, and statistical analysis that was used to develop the suggested methodology
Related
Cataloging source
CEF
Funding information
Research sponsored by the Federal Transit Administration in cooperation with the Transit Development Corporation
LC call number
HE4451
LC item number
.E88 2010
http://library.link/vocab/relatedWorkOrContributorName
  • National Research Council (U.S.)
  • Transit Cooperative Research Program
  • United States
  • Transit Development Corporation
  • AECOM Consult, Inc
Series statement
TCRP report,
Series volume
138
http://library.link/vocab/subjectName
  • Local transit
  • Local transit
  • Local transit
  • Street-railroads
  • Street-railroads
Label
Estimating soft costs for major public transportation fixed guideway projects, AECOM ... [et al.], (electronic resource)
Instantiates
Publication
Note
At head of title: Transit Cooperative Research Program
Bibliography note
Includes bibliographical references (p. 56-57)
Contents
  • pt. 1. Guidebook -- pt. 2. Final report
  • Part 1. Guidebook -- Ch. 1. What Are Soft Costs and Why Do They Matter? -- Ch. 2. How and Who This Guidebook Helps : Audience and Circumstances -- Ch. 3. What Are Soft Costs? -- Ch. 4. How Does the Federal New Starts Process Relate to Soft Costs? -- Ch. 5. How Does the Construction Industry Estimate Soft Costs? -- Ch. 6. How to Estimate Soft Costs for a New Project -- Part 2. Final Report -- Ch. 1. Introduction -- Ch. 2. Literature Review on Soft Cost Definition and Components -- Ch. 3. Soft Cost Estimation : State of the Practice -- Ch. 4. As-Built Soft Cost Analysis -- Ch. 5. Conclusion
Control code
OCM1bookssj0000716588
Dimensions
unknown
Isbn
9780309118262
Isbn Type
(pbk.)
Lccn
2010923718
Specific material designation
remote
System control number
(WaSeSS)bookssj0000716588
Label
Estimating soft costs for major public transportation fixed guideway projects, AECOM ... [et al.], (electronic resource)
Publication
Note
At head of title: Transit Cooperative Research Program
Bibliography note
Includes bibliographical references (p. 56-57)
Contents
  • pt. 1. Guidebook -- pt. 2. Final report
  • Part 1. Guidebook -- Ch. 1. What Are Soft Costs and Why Do They Matter? -- Ch. 2. How and Who This Guidebook Helps : Audience and Circumstances -- Ch. 3. What Are Soft Costs? -- Ch. 4. How Does the Federal New Starts Process Relate to Soft Costs? -- Ch. 5. How Does the Construction Industry Estimate Soft Costs? -- Ch. 6. How to Estimate Soft Costs for a New Project -- Part 2. Final Report -- Ch. 1. Introduction -- Ch. 2. Literature Review on Soft Cost Definition and Components -- Ch. 3. Soft Cost Estimation : State of the Practice -- Ch. 4. As-Built Soft Cost Analysis -- Ch. 5. Conclusion
Control code
OCM1bookssj0000716588
Dimensions
unknown
Isbn
9780309118262
Isbn Type
(pbk.)
Lccn
2010923718
Specific material designation
remote
System control number
(WaSeSS)bookssj0000716588

Library Locations

    • Curtis Laws Wilson LibraryBorrow it
      400 West 14th Street, Rolla, MO, 65409, US
      37.955220 -91.772210
Processing Feedback ...