Summary
Industrial Process Plant Construction Estimating and Man-Hour Analysis focuses on industrial process plants and enables the estimator to apply statistical applications, estimate data tables, and estimate sheets to use methods for collecting, organizing, summarizing, presenting and analyzing historical man-hour data. The book begins with an introduction devoted to labor, productivity measurement, collection of historical data, verification of data, estimating methods, and factors affecting construction labor productivity and impacts of data. It goes on to explore construction statistics and mathematical spreadsheets that are followed by detailed scopes of work, ranging from coal-fired power plants, to oil refineries and solar plants, among others. This book will aid industrial project managers, estimators and engineers with the level of detail and practical utility for today's industrial operations. It is an ideal resource for those involved in engineering, technology and construction estimation. Teachers users how to use day-to day worksheets to estimate equipment and piping for all process plants and power plant projectsIdentifies quantity differences with the comparison method and eliminates impacts between proposed and previously installed equipment applicable for any complexity of design, bid and contractHelps users understand how to implement statistical and estimating methods, scopes of work, man-hour tables and estimate sheets to produce direct craft man-hour estimates, RFPs and field change orders
Member of
Cataloging source
N$T
http://library.link/vocab/creatorName
Storm, Kenneth
Dewey number
331
Index
index present
LC call number
HD4901
Literary form
non fiction
Nature of contents
dictionaries
http://library.link/vocab/subjectName
  • Labor time
  • Hours of labor
  • Time management
  • Industrial management
  • BUSINESS & ECONOMICS
  • POLITICAL SCIENCE
  • Hours of labor
  • Industrial management
  • Time management
Label
Industrial process plant construction estimating and man-hour analysis, Kenneth Storm
Instantiates
Publication
Copyright
Note
Includes index
Antecedent source
unknown
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Intro; Title page; Table of Contents; Copyright; Preface; Introduction; Introduction; Labor productivity and analysis; Regression analysis and correlation; Nonrepetitive one-cycle time study and man-hour analysis; Estimating methods; Comparison of graphic analysis of data (Fig. 3); Unit quantity method; Factors affecting labor productivity and impacts of overtime; Work sampling and man hour analysis; Chapter 1: Introduction to construction statistics using Excel; Abstract; 1.1 Section introduction-Introduction to construction statistics using Excel; 1.2 Graphic analysis of data
  • 1.3 Linear regression and method of least squares1.4 Using Excel to forecast boiler tube replacement; 1.5 Correlation; 1.6 Time series; 1.7 The mean, variance and standard deviation measures of central tendency statistical formulas for the mean, variance and standard deviation; Chapter 2: Process piping; Abstract; 2.1 Section introduction-Piping schedules and tables; 2.2 Piping section general notes; 2.3 Schedule A-Oil refinery piping; 2.4 Schedule B-Diesel power plant piping; 2.5 Schedule C-Solar power plant piping; 2.6 Schedule D-Alloy and nonferrous weld factors
  • 2.7 Schedule E-Industrial plant piping2.8 Schedule K-Underground drainage piping for industrial plants; 2.9 Schedule G-Simple foundations for industrial plants; 2.10 Schedule M-Pipe supports and hangers; 2.11 Standard and line pipe-Wall thickness; Chapter 3: Oil refinery; Abstract; 3.1 Section introduction; 3.2 Stripper unit; 3.3 Stripper unit estimating data; 3.4 Stripper unit estimate; 3.5 Stripper unit-Equipment installation man-hours; Chapter 4: Waste heat boiler; Abstract; 4.1 Equipment descriptions
  • 4.2 General scope of field work required for each 400,000 lb./h waste heat boiler 400,000 lb./h membrane wall boiler with superheater scope of work-field erection4.3 400,000 lb./h waste heat boiler estimate data; 4.4 Waste heat boiler installation estimate; 4.5 Waste heat boiler-Equipment installation man-hours; 4.6 Scope of field work required for structural steel and boiler casing; 4.7 Structural steel and boiler casing estimate data; 4.8 Structural steel installation estimate; 4.9 Structural steel and boiler casing-equipment installation man hours; Chapter 5: Pulp and paper; Abstract
  • 5.1 Recovery boiler5.2 Reheat recovery boiler; 5.3 General scope of field work required for each recovery boiler sheet 1; 5.4 General scope of field work required for each recovery boiler sheet 2 scope of work-field erection; 5.5 Recovery boiler estimate data; 5.6 Recovery boiler installation estimate; 5.7 Recovery boiler installation man-hours; 5.8 General scope of field work required for each reheat recovery boiler sheet 1; 5.9 General scope of field work required for each reheat recovery boiler sheet 2; 5.10 General scope of field work required for each reheat recovery boiler sheet 3
Control code
1102639039
Dimensions
unknown
Extent
1 online resource
File format
unknown
Form of item
online
Isbn
9780128200223
Level of compression
unknown
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
http://library.link/vocab/ext/overdrive/overdriveId
9780128200223
Quality assurance targets
not applicable
Reformatting quality
unknown
Sound
unknown sound
Specific material designation
remote
System control number
(OCoLC)1102639039
Label
Industrial process plant construction estimating and man-hour analysis, Kenneth Storm
Publication
Copyright
Note
Includes index
Antecedent source
unknown
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Intro; Title page; Table of Contents; Copyright; Preface; Introduction; Introduction; Labor productivity and analysis; Regression analysis and correlation; Nonrepetitive one-cycle time study and man-hour analysis; Estimating methods; Comparison of graphic analysis of data (Fig. 3); Unit quantity method; Factors affecting labor productivity and impacts of overtime; Work sampling and man hour analysis; Chapter 1: Introduction to construction statistics using Excel; Abstract; 1.1 Section introduction-Introduction to construction statistics using Excel; 1.2 Graphic analysis of data
  • 1.3 Linear regression and method of least squares1.4 Using Excel to forecast boiler tube replacement; 1.5 Correlation; 1.6 Time series; 1.7 The mean, variance and standard deviation measures of central tendency statistical formulas for the mean, variance and standard deviation; Chapter 2: Process piping; Abstract; 2.1 Section introduction-Piping schedules and tables; 2.2 Piping section general notes; 2.3 Schedule A-Oil refinery piping; 2.4 Schedule B-Diesel power plant piping; 2.5 Schedule C-Solar power plant piping; 2.6 Schedule D-Alloy and nonferrous weld factors
  • 2.7 Schedule E-Industrial plant piping2.8 Schedule K-Underground drainage piping for industrial plants; 2.9 Schedule G-Simple foundations for industrial plants; 2.10 Schedule M-Pipe supports and hangers; 2.11 Standard and line pipe-Wall thickness; Chapter 3: Oil refinery; Abstract; 3.1 Section introduction; 3.2 Stripper unit; 3.3 Stripper unit estimating data; 3.4 Stripper unit estimate; 3.5 Stripper unit-Equipment installation man-hours; Chapter 4: Waste heat boiler; Abstract; 4.1 Equipment descriptions
  • 4.2 General scope of field work required for each 400,000 lb./h waste heat boiler 400,000 lb./h membrane wall boiler with superheater scope of work-field erection4.3 400,000 lb./h waste heat boiler estimate data; 4.4 Waste heat boiler installation estimate; 4.5 Waste heat boiler-Equipment installation man-hours; 4.6 Scope of field work required for structural steel and boiler casing; 4.7 Structural steel and boiler casing estimate data; 4.8 Structural steel installation estimate; 4.9 Structural steel and boiler casing-equipment installation man hours; Chapter 5: Pulp and paper; Abstract
  • 5.1 Recovery boiler5.2 Reheat recovery boiler; 5.3 General scope of field work required for each recovery boiler sheet 1; 5.4 General scope of field work required for each recovery boiler sheet 2 scope of work-field erection; 5.5 Recovery boiler estimate data; 5.6 Recovery boiler installation estimate; 5.7 Recovery boiler installation man-hours; 5.8 General scope of field work required for each reheat recovery boiler sheet 1; 5.9 General scope of field work required for each reheat recovery boiler sheet 2; 5.10 General scope of field work required for each reheat recovery boiler sheet 3
Control code
1102639039
Dimensions
unknown
Extent
1 online resource
File format
unknown
Form of item
online
Isbn
9780128200223
Level of compression
unknown
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
http://library.link/vocab/ext/overdrive/overdriveId
9780128200223
Quality assurance targets
not applicable
Reformatting quality
unknown
Sound
unknown sound
Specific material designation
remote
System control number
(OCoLC)1102639039

Library Locations

    • Curtis Laws Wilson LibraryBorrow it
      400 West 14th Street, Rolla, MO, 65409, US
      37.955220 -91.772210
Processing Feedback ...